|
Under this project initially the refurnishing of different laboratories (undergraduate and post graduate laboratories) will be carried out. In general following work element are proposed to be undertaken,
1. Drainage 2. Fume hoods 3. Painting of Laboratories 4. False Ceiling 5. Electric work 6. Flooring 7. Gas Lines 8. Partition 9. Furniture Repair 10. Plumbing
Needs of refurnishing of laboratories with respect to above mentioned
work elements have been identified and realistic cost estimate as well as implementation plan have been drawn out. The release of required funds from State Government is awaited.
|